Projects

USA / North America

Petrochemical Plant to Point Comfort

DAKO WORLDWIDE was entrusted with the transport of a petrochemical plant to Point Comfort, USA. The boxes were loaded using a tandem hub due to their extreme dimensions and weight.

The Hex Box, with a height of 19 meters, was transported on a 40-axle trailer with a total trailer length of 68 meters.
A particular challenge of the operation was the presence of tight curves along the transport route, which required precise planning, detailed route surveys, and coordinated maneuvering.

Careful execution ensured safe handling and compliance with all technical and safety requirements.

Project Key Facts

Origin: China
Destination: USA
Type of project: Petrochemical Plant
Scope: Delivery free site

Cargo:
Recti box / 59 x 6,50 x 9,50 m / 340 tons
Hex box / 15 x 9 x 19 m / 230 tons
Argon box / 59 x 7,50 x 9 m / 268 tons