El Sauz Wind Farm

DAKO Worldwide Transport GmbH have successfully delivered the EL SAUZ windfarm to DAP San Perlita. The project scope of DAKO included the logistic for 67 x wtg units with approx. 250.000 frt. DAKO were in charge for the oceanfreight from India and Spain, the port handling in the Port of Brownsville – Texas and the final run to jobsite. The 201 x 77.5 m long wind blades for this project, DAKO trucked from the factory in Matamoros, to the jobsite.

Project Key Facts

Origin: Europe, Asia, Mexico
Destination: Texas, USA
Type of project: Wind Energy
Scope: Delivery free site

Cargo:
201 Blades / length 77,5 m
67 Nacelles / 70 tons each
67 Drive trains / 73,5 tons each
67 Hubs / 61 tons each
67 Tower sets / 62 – 68,5 tons