Projects

USA / North America
El Sauz Wind Farm
DAKO Worldwide Transport GmbH have successfully delivered the EL SAUZ windfarm to DAP San Perlita. The project scope of DAKO included the logistic for 67 x wtg units with approx. 250.000 frt. DAKO were in charge for the oceanfreight from India and Spain, the port handling in the Port of Brownsville – Texas and the final run to jobsite. The 201 x 77.5 m long wind blades for this project, DAKO trucked from the factory in Matamoros, to the jobsite.
Project Key Facts
Origin: Europe, Asia, Mexico
Destination: Texas, USA
Type of project: Wind Energy
Scope: Delivery free site
Cargo:
201 Blades / length 77,5 m
67 Nacelles / 70 tons each
67 Drive trains / 73,5 tons each
67 Hubs / 61 tons each
67 Tower sets / 62 – 68,5 tons



